Expenses:
$0.00
Hours:
2.00
Nov 27, 2023
Took the next step, removed existing wiring connected to the engine, Dismounted the engine and its on the bench to be worked on. The air baffles are all riveted in place, so the minor challenge is learning how to drill out rivets in thin aluminum. I have to modify anyway for the turbo and will be nice to have the side panels easily removable.
Next Steps: Check clearances on the engine assembled in 2010, then remove everything. By next week should know if I need to lap the valve seats, etc.

RV-4
182P, Q, R, R182, TR182
M20J
Tucano Front Panel
Tucano Front Panel
Tucano Front Panel
Tucano Rear Panel
177 Cardinal
177 Cardinal
177 Cardinal
Tucano Front Panel
Tucano Front Panel
MK-4
F1 Rocket
172
172
172
172
172
Mustang II
182S
CH 750 Cruzer
150
182S
182S
177 Cardinal
Model 5
Model 5
Patrol
601 HD/S
RV-4
RV-4
RV-4
Cherokee 180C
177 Cardinal
177 Cardinal
177 Cardinal
Maule
AA-5
180 / 185