Expenses:  $0.00
Hours:  25.00
Jan 23, 2023
Many hours were spend on wiring sensors, crimping, splicing, and re-doing the whole power bus just to make sure most of the breakers still fit in the original place rather than make a bunch of holes in the panel. Added an Avionics Master switch. 
Everything ringed out, power and ground is good. Power-on successfull (after getting a better power source, rather than a trickle charger) and getting the settings put in. At this point......it might not take much longer .....