Expenses:
$0.00
Hours:
0.00
Apr 09, 2024
I've installed the Spitfire Concepts flap handle. I'm using the existing cables for now, tucked away above the baggage compartment, but plan to replace them with shorter soon. I now have 3 flap positions that I measured to be @ 11° / 28° / 43°.

RV-7/9
RV-7/9
RV-7/9
RV-7/9
CH 750 Cruzer
CH 750 Cruzer
M20J
CH 750 Cruzer
172
Citabria
Citabria
PA-20/22
RV-6
PA-20/22
PA-20/22
Citabria
RV-6
RV-6
RV-6
RV-6
RV-7/9
RV-8
RV-7/9
RV-7/9
RV-7/9
RV-8
RV-8
Cherokee 180C
Cherokee 180C
Cherokee 180C
RV-8
Q200
172
172
172
172